Bai, S, Li, M, Song, L and Kong, R (2021) Developing a Common Library of Prefabricated Structure Components through Graphic Media Mapping to Improve Design Efficiency. Journal of Construction Engineering and Management, 147(01).

Ernstsen, S N, Whyte, J, Thuesen, C and Maier, A (2021) How Innovation Champions Frame the Future: Three Visions for Digital Transformation of Construction. Journal of Construction Engineering and Management, 147(01).

Joubert, F, Steyn, E and Pretorius, L (2021) Using the HAZOP Method to Conduct a Risk Assessment on the Dismantling of Large Industrial Machines and Associated Structures: Case Study. Journal of Construction Engineering and Management, 147(01).

Kim, H and Ham, Y (2021) Increasing Reliability of Participatory Sensing for Utility Pole Condition Assessment Using Fuzzy Inference. Journal of Construction Engineering and Management, 147(01).

Korb, S and Sacks, R (2021) Agent-Based Simulation of General Contractor–Subcontractor Interactions in a Multiproject Environment. Journal of Construction Engineering and Management, 147(01).

Li, M, Baek, M and Ashuri, B (2021) Forecasting Ratio of Low Bid to Owner’s Estimate for Highway Construction. Journal of Construction Engineering and Management, 147(01).

Love, P E D, Matthews, J and Fang, W (2021) Envisioning Rework in Practice: Emergent Insights from a Longitudinal Study. Journal of Construction Engineering and Management, 147(01).

Ma, L, Guo, H and Fang, Y (2021) Analysis of Construction Workers’ Safety Behavior Based on Myers-Briggs Type Indicator Personality Test in a Bridge Construction Project. Journal of Construction Engineering and Management, 147(01).

Mohamad, M and Tran, D Q (2021) Risk-Based Prioritization Approach to Construction Inspections for Transportation Projects. Journal of Construction Engineering and Management, 147(01).

Moon, S, Lee, G, Chi, S and Oh, H (2021) Automated Construction Specification Review with Named Entity Recognition Using Natural Language Processing. Journal of Construction Engineering and Management, 147(01).

Shabani Ardakani, S and Nik-Bakht, M (2021) Functional Evaluation of Change Order and Invoice Management Processes under Different Procurement Strategies: Social Network Analysis Approach. Journal of Construction Engineering and Management, 147(01).

Tai, H, Chen, J, Cheng, J, Wei, H, Hsu, S and Liu, H (2021) Determining Worker Training Time for Precast Component Production in Construction: Empirical Study in Taiwan. Journal of Construction Engineering and Management, 147(01).

Tetik, M, Peltokorpi, A, Seppänen, O, Leväniemi, M and Holmström, J (2021) Kitting Logistics Solution for Improving On-Site Work Performance in Construction Projects. Journal of Construction Engineering and Management, 147(01).

  • Type: Journal Article
  • Keywords: Construction logistics; Material kitting; Assembly kit; Work performance; Renovation projects;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001921
  • Abstract:
    Material kitting has been proposed as an effective solution to organize just-in-time (JIT) material deliveries around assembly tasks; however, its applicability and impact on construction projects has not been thoroughly studied. The purpose of this research is to evaluate the applicability of kitting by focusing on its impact on work performance and requirements for management. The authors conducted a case study to analyze a kitting intervention in a general contractor and logistics company, comparing four renovation projects in the indoor construction phase with and without kitting. Findings indicate that kitting can stabilize assembly work and increase workplace utilization and on-site labor productivity. However, it requires centralized material logistics, smooth information flow between operations, and subcontractors’ commitment to the production model. This research contributes to the connection between material logistics and work performance, suggesting that kitting should be linked to a redesign of the general production model toward a synchronized takt-based production system. The research is limited to four projects.

Wu, H, Qian, Q K, Straub, A and Visscher, H (2021) Stakeholder Perceptions of Transaction Costs in Prefabricated Housing Projects in China. Journal of Construction Engineering and Management, 147(01).

Wu, J, Sadraddin, H L, Ren, R, Zhang, J and Shao, X (2021) Invariant Signatures of Architecture, Engineering, and Construction Objects to Support BIM Interoperability between Architectural Design and Structural Analysis. Journal of Construction Engineering and Management, 147(01).

Yu, X and Ergan, S (2021) Key Variables in Determining Energy Shaving Capacity of Buildings during Demand Response Events. Journal of Construction Engineering and Management, 147(01).

Yu, X, Mehmood, K, Paulsen, N, Ma, Z and Kwan, H K (2021) Why Safety Knowledge Cannot be Transferred Directly to Expected Safety Outcomes in Construction Workers: The Moderating Effect of Physiological Perceived Control and Mediating Effect of Safety Behavior. Journal of Construction Engineering and Management, 147(01).

Zhang, S, Li, J, Li, Y and Zhang, X (2021) Revenue Risk Allocation Mechanism in Public-Private Partnership Projects: Swing Option Approach. Journal of Construction Engineering and Management, 147(01).